ASTLE, MIKE

Back to JOBS IN PROGRESS
Exit Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
CEMENT
738682
CEMENT TOTAL 2
TOTAL 2
EQUIPMENT 160 EXCAVATOR
737781
737818
737783
737785
737787
738021
738026
160 EXCAVATOR TOTAL 32.5
75 EXCAVATOR
738503
738381
738502
75 EXCAVATOR TOTAL 13.5
BOOMTRUCK
738118
738245
BOOMTRUCK TOTAL 7.5
ONE TON
738204
ONE TON TOTAL 2.5
PULPTRUCK
737902
PULPTRUCK TOTAL 6
PUMP TRUCK
738403
PUMP TRUCK TOTAL 0
TRIAXLE
737802
737811
737804
737813
737808
TRIAXLE TOTAL 36
WHEELER
737847
WHEELER TOTAL 4
EQUIPMENT TOTAL 102
LABOR CEMENT
738420
737930
737931
737934
737778
737922
737935
738139
738140
738144
738064
738141
738145
738065
738142
738143
738147
738394
738402
738419
738395
738408
738396
738409
738398
738413
738677
739014
739021
739019
CEMENT TOTAL 222.5
PLOWING AND SANDING
737780
738473
PLOWING AND SANDING TOTAL 0
REGULAR
737782
737789
737784
737786
737788
737790
738022
738061
738027
738504
738451
738452
REGULAR TOTAL 60.75
LABOR TOTAL 283.25
MATERIALS BOLTS
738407
BOLTS TOTAL 27
CALCIUM
737933
737937
738173
738404
CALCIUM TOTAL 12
CONCRETE, 3000 PSI
737936
738405
739022
CONCRETE, 3000 PSI TOTAL 62
DRAIN, FLOOR
738411
DRAIN, FLOOR TOTAL 1
PIPE, SCH 20-4" PERF
738023
738028
PIPE, SCH 20-4" PERF TOTAL 260
PIPE, SCH 35-4"
738031
PIPE, SCH 35-4" TOTAL 20
POLY
738745
737932
738414
POLY TOTAL 0
REBAR, #4
737938
738146
738406
REBAR, #4 TOTAL 61
SCH 20 45, 4"
738030
SCH 20 45, 4" TOTAL 2
SCH 20 90, 4"
738024
738029
SCH 20 90, 4" TOTAL 11
TAR
738410
TAR TOTAL 2
TEE, SCH 20, 4"
738025
TEE, SCH 20, 4" TOTAL 2
WIRE, FLOOR
738416
WIRE, FLOOR TOTAL 2
MATERIALS TOTAL 462
OTHER FEES DISPOSAL FEES
737903
DISPOSAL FEES TOTAL 0
OTHER FEES TOTAL 0
TRUCK MATERIALS GRAVEL
735839
738642
739468
739470
GRAVEL TOTAL 120
LEDGE, 3"
737807
737846
LEDGE, 3" TOTAL 68
STONE, 3/4"
737814
738122
738192
738347
738205
738415
STONE, 3/4" TOTAL 91
STONE, 3/4" BEIGE
744245
STONE, 3/4" BEIGE TOTAL 12
TRUCK MATERIALS TOTAL 291
OVERALL TOTAL 1140.25

104 Records