MUSETTI, MICHAEL

Back to JOBS IN PROGRESS
Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 75 EXCAVATOR
6/29/2026 SAVAGE,BRIAN 1 HRS MOVED 745692
6/30/2026 SAVAGE,BRIAN 1.5 HRS MOVED 745694
75 EXCAVATOR TOTAL 2.5
PULPTRUCK
7/2/2026 CHISHOLM,NATE 8 HRS 745829
7/3/2026 CHISHOLM,NATE 2 HRS 745832
PULPTRUCK TOTAL 10
TRIAXLE
7/1/2026 ALVAREZ,JOHN 5 HRS 745853
TRIAXLE TOTAL 5
EQUIPMENT TOTAL 17.5
OTHER FEES DISPOSAL FEES
7/2/2026 CHISHOLM,NATE 0 TON 4 LDS BRUSH 745830
7/3/2026 CHISHOLM,NATE 0 TON 1 LD BRUSH 745833
DISPOSAL FEES TOTAL 0
OTHER FEES TOTAL 0
TRUCK MATERIALS GRAVEL
6/29/2026 HAVEY,DICK 98 YDS FELLIS PIT MIA 745657
6/29/2026 ROUND 2,TRUCKING 126 YDS DAVIS PIT 745676
6/30/2026 HAVEY,DICK 14 YDS FELLIS PIT MIA 745658
6/30/2026 HAVEY,DICK 70 YDS MARSH MIA 745659
6/30/2026 ROUND 2,TRUCKING 18 YDS DAVIS PIT 745677
6/30/2026 ROUND 2,TRUCKING 90 YDS MARSH 745678
6/30/2026 ROUND 2,TRUCKING 18 YDS SMITH LOT 745679
6/30/2026 POND,HOWARD 18 YDS FELLIS PIT 745710
6/30/2026 POND,HOWARD 18 YDS MARSH 745711
6/30/2026 KELLEY,DENNIS 70 YDS MARSH MIA 745730
6/30/2026 EDWARDS,GUY 28 YDS MARSH 745771
6/30/2026 CROSSMAN,EVANS 18 YDS FELLIS PIT 745795
6/30/2026 CROSSMAN,EVANS 36 YDS MARSH 745798
6/30/2026 ALVAREZ,JOHN 18 YDS FELLIS PIT BESIDE MIKE'S SHOP 745844
6/30/2026 ALVAREZ,JOHN 72 YDS MARSH 745845
6/30/2026 ALVAREZ,JOHN 18 YDS SMITH LOT 745846
7/2/2026 ALVAREZ,JOHN 18 YDS MARSH 745857
GRAVEL TOTAL 748
GRAVEL, SCREENED
7/2/2026 ALVAREZ,JOHN 54 YDS DAVIS PIT 745855
GRAVEL, SCREENED TOTAL 54
LEDGE, 3"
6/24/2026 HAVEY,DICK 28 YDS MARSH MIA'S 745444
6/26/2026 KELLEY,DENNIS 14 YDS MARSH MIA 745505
LEDGE, 3" TOTAL 42
SAND, SCREENED
6/30/2026 HAVEY,DICK 14 YDS DAVIS PIT MIA 745660
7/1/2026 ALVAREZ,JOHN 18 YDS DAVIS PIT 745851
7/1/2026 ALVAREZ,JOHN 54 YDS BASS HARBOR STOCKPILE 745852
7/2/2026 ALVAREZ,JOHN 18 YDS BASS HARBOR STOCKPILE 745856
SAND, SCREENED TOTAL 104
TRUCK MATERIALS TOTAL 948
OVERALL TOTAL 965.5

31 Records