COOK, MIKE

Back to JOBS IN PROGRESS
Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 75 EXCAVATOR
7/1/2026 HOPKINS,FRANK 8 HRS 745994
7/1/2026 SAVAGE,BRIAN 1 HRS MOVED 746097
75 EXCAVATOR TOTAL 9
ONE TON
7/1/2026 MCALLISTER,JAMES 3 HRS 745934
7/10/2026 LYONS,GEORGE 3 HRS 746513
ONE TON TOTAL 6
EQUIPMENT TOTAL 15
LABOR CEMENT
6/7/2026 LYONS,GEORGE 3 HRS 746504
7/6/2026 LYONS,GEORGE 1.5 HRS 746500
7/7/2026 OVERLOCK,MIKE 3 HRS 746492
7/7/2026 KEENE,BIDDY 3 HRS 746516
7/9/2026 OVERLOCK,MIKE 1 HRS 746496
7/9/2026 LYONS,GEORGE 1 HRS 746511
7/10/2026 LYONS,GEORGE 1.5 HRS 746512
CEMENT TOTAL 14
REGULAR
7/1/2026 MCALLISTER,JAMES 6 HRS 745937
7/10/2026 LEAR,SHANNON 4.5 HRS 746371
REGULAR TOTAL 10.5
LABOR TOTAL 24.5
MATERIALS CONCRETE, 3000 PSI
7/7/2026 LYONS,GEORGE 6 YDS $1,049.07 746505
CONCRETE, 3000 PSI TOTAL 6
REBAR, #4
7/3/2026 LYONS,GEORGE 6 BARS 746077
REBAR, #4 TOTAL 6
WIRE, SHEET
7/6/2026 LYONS,GEORGE 3 SHEETS 746501
WIRE, SHEET TOTAL 3
MATERIALS TOTAL 15
OTHER FEES DISPOSAL FEES
7/1/2026 MCALLISTER,JAMES 0 TON 1 - 1 TON LD CONCRETE 745935
DISPOSAL FEES TOTAL 0
OTHER FEES TOTAL 0
TRUCK MATERIALS GRAVEL, 1" MINUS CRUSHED
7/1/2026 MCALLISTER,JAMES 4 YDS BASS HARBOR STOCKPILE 745936
GRAVEL, 1" MINUS CRUSHED TOTAL 4
TRUCK MATERIALS TOTAL 4
OVERALL TOTAL 58.5

18 Records