TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 160 EXCAVATOR
745470
745650
745651
745653
745654
160 EXCAVATOR TOTAL 22.5
35 EXCAVATOR
746105
745623
745652
745628
745990
35 EXCAVATOR TOTAL 22
75 EXCAVATOR
727162
727610
727613
729563
729669
730064
730069
730305
730496
736202
736568
75 EXCAVATOR TOTAL 43.5
8 YD TRUCK
730182
745747
8 YD TRUCK TOTAL 3
ONE TON
745624
745630
ONE TON TOTAL 2
WHEELER
727628
730570
WHEELER TOTAL 11
EQUIPMENT TOTAL 104
LABOR CEMENT
727735
727753
727738
727755
727731
727741
CEMENT TOTAL 29
REGULAR
727611
727614
729564
729613
729569
730050
730065
730055
730070
730288
730306
730350
730442
736569
736575
745626
745629
REGULAR TOTAL 77
LABOR TOTAL 106
MATERIALS ADAPTOR SCH 35 T0 SCH 40 4"
730318
ADAPTOR SCH 35 T0 SCH 40 4" TOTAL 1
BIGFOOT
727739
BIGFOOT TOTAL 8
BOLTS
727743
BOLTS TOTAL 7
CLEANOUT CAP, 4" SCH 40
729617
CLEANOUT CAP, 4" SCH 40 TOTAL 1
CONCRETE, 3000 PSI
727742
CONCRETE, 3000 PSI TOTAL 3.5
COUPL, SCHEDULE 40-4"
729618
COUPL, SCHEDULE 40-4" TOTAL 1
CULVERT, 12"
745991
CULVERT, 12" TOTAL 30
MISCELLANEOUS
745627
MISCELLANEOUS TOTAL 0
PIPE, SCH 40-4"
727612
PIPE, SCH 40-4" TOTAL 10
SADDLE
730317
SADDLE TOTAL 1
SCH 20 22 1/2, 4"
729614
SCH 20 22 1/2, 4" TOTAL 1
SCH 35 45
730316
SCH 35 45 TOTAL 2
SCH 40, ST 45
729615
SCH 40, ST 45 TOTAL 2
SONOTUBE, 12"
727740
SONOTUBE, 12" TOTAL 26
WYE, SCH 40
729616
WYE, SCH 40 TOTAL 1
MATERIALS TOTAL 94.5
TRUCK MATERIALS FILL
745527
FILL TOTAL 36
GRAVEL
730179
730180
745500
GRAVEL TOTAL 130
GRAVEL, 1" MINUS CRUSHED
745503
745631
GRAVEL, 1" MINUS CRUSHED TOTAL 16
GRAVEL, 2" MINUS
730569
GRAVEL, 2" MINUS TOTAL 18
LEDGE
745502
LEDGE TOTAL 56
LEDGE, 3"
727626
LEDGE, 3" TOTAL 56
SAND, SCREENED
727627
730178
745499
745550
SAND, SCREENED TOTAL 54
STONE, 1 1/2"
745748
STONE, 1 1/2" TOTAL 3
STONE, 3/4"
745625
STONE, 3/4" TOTAL 4
STONE, 3/4" BEIGE
730181
STONE, 3/4" BEIGE TOTAL 8
TRUCK MATERIALS TOTAL 381
OVERALL TOTAL 685.5

81 Records