ROBBINS, CRAIG

Back to JOBS IN PROGRESS
Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT BOOMTRUCK
7/8/2026 GOTT,TOM 3 HRS 746392
BOOMTRUCK TOTAL 3
EQUIPMENT TOTAL 3
LABOR CEMENT
6/22/2026 WOLFF,ROB 8.25 HRS 745247
6/22/2026 MILES,COOPER 8.25 HRS 745249
6/22/2026 LYONS,GEORGE 8 HRS 745601
6/22/2026 KEENE,BIDDY 8 HRS 745618
6/24/2026 LYONS,GEORGE 5.5 HRS 745606
6/24/2026 KEENE,BIDDY 5.5 HRS 745619
6/26/2026 LYONS,GEORGE 6 HRS 745611
7/8/2026 OVERLOCK,MIKE 6.5 HRS 746494
7/8/2026 LYONS,GEORGE 8.5 HRS 746507
7/8/2026 KEENE,BIDDY 7.5 HRS 746518
7/9/2026 OVERLOCK,MIKE 7 HRS 746495
7/9/2026 LYONS,GEORGE 7 HRS 746509
CEMENT TOTAL 86
REGULAR
6/26/2026 CARTER,CAMERON 6 HRS 745405
7/14/2026 WOLFF,ROB 7.25 HRS 746539
7/14/2026 MILES,COOPER 7.25 HRS 746567
7/14/2026 GRAY,LINCOLN 7 HRS 746621
REGULAR TOTAL 27.5
LABOR TOTAL 113.5
MATERIALS CONCRETE, 3000 PSI
6/24/2026 GOTT,BETH 12 YDS $1,951.41 746108
CONCRETE, 3000 PSI TOTAL 12
PIPE, SCH 20-4" PERF
6/26/2026 LYONS,GEORGE 300 FT 745612
PIPE, SCH 20-4" PERF TOTAL 300
PIPE, SCH 35-4"
6/26/2026 LYONS,GEORGE 84 FT 745613
PIPE, SCH 35-4" TOTAL 84
REBAR, #4
6/22/2026 LYONS,GEORGE 30 BARS 745602
7/8/2026 LYONS,GEORGE 12 BARS 746508
7/9/2026 LYONS,GEORGE 5 BARS 746510
REBAR, #4 TOTAL 47
SCH 35 45
6/26/2026 LYONS,GEORGE 1 EA 745616
SCH 35 45 TOTAL 1
SCH 35 90, 4"
6/26/2026 LYONS,GEORGE 10 EA 745614
SCH 35 90, 4" TOTAL 10
SCH 35, 22 1/2 4"
6/26/2026 LYONS,GEORGE 1 EA 745617
SCH 35, 22 1/2 4" TOTAL 1
TANK, 1000 GAL
6/27/2026 GOTT,BETH 1 EA $1,194.05 746109
TANK, 1000 GAL TOTAL 1
MATERIALS TOTAL 456
TRUCK MATERIALS SCREENINGS
745599
CANCEL
SCREENINGS TOTAL 18
STONE, 1 1/2"
6/23/2026 ALVAREZ,JOHN 18 YDS BASS HARBOR STOCKPILE 745587
STONE, 1 1/2" TOTAL 18
STONE, 3/4"
5/21/2026 KELLEY,DENNIS 14 YDS BASS HARBOR STOCKPILE 743186
6/26/2026 ALVAREZ,JOHN 54 YDS DAVIS PIT 745600
STONE, 3/4" TOTAL 68
TRUCK MATERIALS TOTAL 104
OVERALL TOTAL 676.5

31 Records