WADE, DAVID

Back to JOBS IN PROGRESS
Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT DOZER, 550
4/21/2026 EISWORTH,GEORGE 6 HRS 741347
DOZER, 550 TOTAL 6
EQUIPMENT TOTAL 6
LABOR CEMENT
4/30/2026 LYONS,GEORGE 1.5 HRS 741902
5/8/2026 OVERLOCK,MIKE 4 HRS 742327
5/8/2026 LYONS,GEORGE 4 HRS 742341
5/19/2026 OVERLOCK,MIKE 3.5 HRS 743288
5/19/2026 LYONS,GEORGE 3 HRS 743295
5/19/2026 KEENE,BIDDY 3.5 HRS 743312
5/20/2026 OVERLOCK,MIKE 7 HRS 743291
5/20/2026 LYONS,GEORGE 7 HRS 743302
5/20/2026 KEENE,BIDDY 6.5 HRS 743315
5/26/2026 OVERLOCK,MIKE 1 HRS 743747
5/26/2026 LYONS,GEORGE 2.5 HRS 743753
5/26/2026 KEENE,BIDDY 2.5 HRS 743765
CEMENT TOTAL 46
LABOR TOTAL 46
MATERIALS BOLTS
5/20/2026 LYONS,GEORGE 43 EA 743303
BOLTS TOTAL 43
CONCRETE, 3000 PSI
5/20/2026 LYONS,GEORGE 24.5 YDS $4,332.57 743305
CONCRETE, 3000 PSI TOTAL 24.5
MISCELLANEOUS
5/20/2026 LYONS,GEORGE 0 EA $12.60 5' GROUNDING WIRE 743304
MISCELLANEOUS TOTAL 0
POLY
5/8/2026 LYONS,GEORGE 1 SQFT 742342
POLY TOTAL 1
REBAR, #4
5/19/2026 LYONS,GEORGE 18 BARS 743297
REBAR, #4 TOTAL 18
STYROFOAM, 2"
4/30/2026 LYONS,GEORGE 10 SHEETS 741903
5/8/2026 LYONS,GEORGE 30 SHEETS 742343
STYROFOAM, 2" TOTAL 40
WIRE, FLOOR
5/19/2026 LYONS,GEORGE 2 ROLLS 743296
WIRE, FLOOR TOTAL 2
MATERIALS TOTAL 128.5
OVERALL TOTAL 180.5

21 Records