FRAYSSE, MICHAEL

Back to JOBS IN PROGRESS
Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 75 EXCAVATOR
1/12/2026 EISWORTH,GEORGE 3.5 HRS 737377
1/14/2026 EISWORTH,GEORGE 9.5 HRS 737381
1/15/2026 EISWORTH,GEORGE 8.5 HRS 737382
1/16/2026 EISWORTH,GEORGE 6.5 HRS 737383
7/16/2026 LOWE,AL 8 HRS 746534
7/17/2026 LOWE,AL 4 HRS 746536
75 EXCAVATOR TOTAL 40
BOOMTRUCK
3/5/2026 GOTT,TOM 3 HRS TRUSSESS 739305
BOOMTRUCK TOTAL 3
ONE TON
1/14/2026 LYONS,GEORGE 3 HRS 737531
ONE TON TOTAL 3
EQUIPMENT TOTAL 46
LABOR CEMENT
1/14/2026 LYONS,GEORGE 6 HRS 737530
1/16/2026 OVERLOCK,MIKE 8 HRS 737524
1/16/2026 LYONS,GEORGE 8 HRS 737536
2/6/2026 OVERLOCK,MIKE 3 HRS 738399
2/6/2026 LYONS,GEORGE 3 HRS 738417
4/29/2026 LYONS,GEORGE 1.5 HRS 741898
5/28/2026 OVERLOCK,MIKE 2 HRS 743750
5/28/2026 LYONS,GEORGE 2 HRS 743756
5/28/2026 KEENE,BIDDY 2 HRS 743768
5/29/2026 OVERLOCK,MIKE 4 HRS 743751
5/29/2026 LYONS,GEORGE 4 HRS 743758
6/1/2026 OVERLOCK,MIKE 2.5 HRS 744208
6/1/2026 LYONS,GEORGE 2.5 HRS 744221
6/2/2026 OVERLOCK,MIKE 5 HRS 744209
6/2/2026 LYONS,GEORGE 4.5 HRS 744222
6/2/2026 LYONS,GEORGE 0.5 HRS 744225
6/3/2026 OVERLOCK,MIKE 8.5 HRS 744210
6/3/2026 LYONS,GEORGE 8.5 HRS 744226
6/15/2026 LYONS,GEORGE 1.5 HRS 745130
CEMENT TOTAL 77
PLOWING
1/27/2026 GOTT,TIM 0 HRS $100.00 738057
PLOWING TOTAL 0
REGULAR
1/12/2026 LITTLE,GARY 5.5 HRS COREDRILLING 7" HOLE 737322
1/12/2026 EISWORTH,GEORGE 2 HRS 737376
1/15/2026 PINKHAM,DONALD 6.5 HRS 737302
7/16/2026 LOWE,AL 0.5 HRS 746535
7/17/2026 LOWE,AL 4 HRS 746537
7/17/2026 CARNEY,CHRIS 6 HRS 746714
REGULAR TOTAL 24.5
LABOR TOTAL 101.5
MATERIALS BIGFOOT
1/16/2026 LYONS,GEORGE 6 EA $133.56 737540
BIGFOOT TOTAL 6
CONCRETE, 3000 PSI
1/14/2026 LYONS,GEORGE 2 YDS $496.27 EXTRA 737533
1/16/2026 LYONS,GEORGE 2 YDS $496.27 737539
2/6/2026 LYONS,GEORGE 2 YDS $511.04 738418
6/3/2026 LYONS,GEORGE 17.5 YDS $3,089.88 744227
CONCRETE, 3000 PSI TOTAL 23.5
DRAIN, FLOOR
5/29/2026 LYONS,GEORGE 1 EA 743760
DRAIN, FLOOR TOTAL 1
POLY
6/2/2026 LYONS,GEORGE 0 SQFT 1 ROLL 744223
POLY TOTAL 0
REBAR, #4
1/16/2026 LYONS,GEORGE 4 BARS 737538
5/28/2026 LYONS,GEORGE 5 BARS 743757
REBAR, #4 TOTAL 9
SCH 20 90, 4"
5/29/2026 LYONS,GEORGE 2 EA 743761
SCH 20 90, 4" TOTAL 2
SONOTUBE, 10"
1/16/2026 LYONS,GEORGE 24 FT $65.09 737537
SONOTUBE, 10" TOTAL 24
STYROFOAM, 2"
6/2/2026 LYONS,GEORGE 29 SHEETS 744224
STYROFOAM, 2" TOTAL 29
WATERPLUG
7/17/2026 CARNEY,CHRIS 0 GALS 2 LBS 746716
WATERPLUG TOTAL 0
WIRE, FLOOR
743759
CANCEL
WIRE, FLOOR TOTAL 2
MATERIALS TOTAL 96.5
TRUCK MATERIALS GRAVEL
1/15/2026 EDWARDS,GUY 14 YDS FELLIS PIT 737492
GRAVEL TOTAL 14
SAND
1/14/2026 EDWARDS,GUY 70 YDS DAVIS PIT 737490
1/15/2026 EDWARDS,GUY 24 YDS DAVIS PIT 737491
SAND TOTAL 94
SAND, SCREENED
1/14/2026 POND,HOWARD 18 YDS DAVIS PIT 737459
1/14/2026 EDWARDS,GUY 28 YDS DAVIS PIT 737489
SAND, SCREENED TOTAL 46
STONE, 3/4"
1/14/2026 LYONS,GEORGE 6 YDS BASS HARBOR STOCKPILE 737532
5/29/2026 FERNALD,CECIL 8 YDS BASS HARBOR STOCKPILE 743685
STONE, 3/4" TOTAL 14
STONE, 3/8"
1/12/2026 FERNALD,CECIL 12 YDS BASS HARBOR STOCKPILE 737558
STONE, 3/8" TOTAL 12
TRUCK MATERIALS TOTAL 180
OVERALL TOTAL 424

56 Records