FRAYSSE, MICHAEL

Back to JOBS IN PROGRESS
Exit Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 75 EXCAVATOR
737377
737381
737382
737383
746534
746536
75 EXCAVATOR TOTAL 40
BOOMTRUCK
739305
BOOMTRUCK TOTAL 3
ONE TON
737531
ONE TON TOTAL 3
EQUIPMENT TOTAL 46
LABOR CEMENT
737530
737524
737536
738399
738417
741898
743750
743756
743768
743751
743758
744208
744221
744209
744222
744225
744210
744226
745130
CEMENT TOTAL 77
PLOWING
738057
PLOWING TOTAL 0
REGULAR
737322
737376
737302
746535
746537
746714
REGULAR TOTAL 24.5
LABOR TOTAL 101.5
MATERIALS BIGFOOT
737540
BIGFOOT TOTAL 6
CONCRETE, 3000 PSI
737533
737539
738418
744227
CONCRETE, 3000 PSI TOTAL 23.5
DRAIN, FLOOR
743760
DRAIN, FLOOR TOTAL 1
POLY
744223
POLY TOTAL 0
REBAR, #4
737538
743757
REBAR, #4 TOTAL 9
SCH 20 90, 4"
743761
SCH 20 90, 4" TOTAL 2
SONOTUBE, 10"
737537
SONOTUBE, 10" TOTAL 24
STYROFOAM, 2"
744224
STYROFOAM, 2" TOTAL 29
WATERPLUG
746716
WATERPLUG TOTAL 0
WIRE, FLOOR
743759
WIRE, FLOOR TOTAL 2
MATERIALS TOTAL 96.5
TRUCK MATERIALS GRAVEL
737492
GRAVEL TOTAL 14
SAND
737490
737491
SAND TOTAL 94
SAND, SCREENED
737459
737489
SAND, SCREENED TOTAL 46
STONE, 3/4"
737532
743685
STONE, 3/4" TOTAL 14
STONE, 3/8"
737558
STONE, 3/8" TOTAL 12
TRUCK MATERIALS TOTAL 180
OVERALL TOTAL 424

56 Records