INNESS HANCOCK

Back to JOBS IN PROGRESS
Grid Edit
TYPE DESCRIPTION DATE EMPLOYEE QUANTITY UNIT PIT OUR COST NOTES INVOICE NUMBER EDIT #
EQUIPMENT 75 EXCAVATOR
6/29/2026 LEAR,SHANNON 1.5 HRS MOVED 746081
6/29/2026 LOWE,AL 9 HRS 746083
6/30/2026 LOWE,AL 8 HRS 746085
7/1/2026 LOWE,AL 8 HRS 746087
75 EXCAVATOR TOTAL 26.5
ONE TON
7/1/2026 PINKHAM,DONALD 8 HRS 745904
7/1/2026 KREINUS,STEVE 1 HRS 745980
ONE TON TOTAL 9
WHEELER
6/29/2026 KELLEY,DENNIS 2.5 HRS 746080
WHEELER TOTAL 2.5
EQUIPMENT TOTAL 38
LABOR REGULAR
6/29/2026 MCALLISTER,JAMES 11 HRS 745929
6/29/2026 LOWE,AL 2 HRS 746084
6/30/2026 MCALLISTER,JAMES 9.5 HRS 745930
6/30/2026 KREINUS,STEVE 8 HRS 745974
6/30/2026 LOWE,AL 2 HRS 746086
7/1/2026 KREINUS,STEVE 10.5 HRS 745982
7/1/2026 LOWE,AL 1 HRS 746088
REGULAR TOTAL 44
LABOR TOTAL 44
MATERIALS FERNCO, 4"
6/30/2025 MCALLISTER,JAMES 2 EA 745931
FERNCO, 4" TOTAL 2
HAY
7/1/2026 KREINUS,STEVE 5 BALES 745983
HAY TOTAL 5
MISCELLANEOUS
6/30/2026 KREINUS,STEVE 0 EA 2 - BRS I" CB CTSXIP 745975
745978
CANCEL
6/30/2026 KREINUS,STEVE 0 EA 2 - 8" TO 6" FERNCO 745979
MISCELLANEOUS TOTAL 0
PIPE, 1" CTS
6/30/2026 KREINUS,STEVE 150 FT 745976
PIPE, 1" CTS TOTAL 150
PIPE, SCH 35-4"
6/30/2026 MCALLISTER,JAMES 3 FT 745932
PIPE, SCH 35-4" TOTAL 3
PIPE, SCH 35-6"
6/30/2026 MCALLISTER,JAMES 3 FT 745933
PIPE, SCH 35-6" TOTAL 3
SEED
7/1/2026 KREINUS,STEVE 10 LBS 745984
SEED TOTAL 10
STYROFOAM, 2"
6/30/2026 KREINUS,STEVE 3 SHEETS 745977
STYROFOAM, 2" TOTAL 3
MATERIALS TOTAL 176
TRUCK MATERIALS GRAVEL, 1" MINUS CRUSHED
7/1/2026 PINKHAM,DONALD 3 YDS BASS HARBOR STOCKPILE PINK 745902
7/1/2026 PINKHAM,DONALD 3 YDS BASS HARBOR STOCKPILE GRAY 745903
GRAVEL, 1" MINUS CRUSHED TOTAL 6
LOAM, SCREEN
7/1/2026 PINKHAM,DONALD 6 YDS BASS HARBOR STOCKPILE 745901
7/1/2026 KREINUS,STEVE 3 YDS BASS HARBOR STOCKPILE 745981
LOAM, SCREEN TOTAL 9
TRUCK MATERIALS TOTAL 15
OVERALL TOTAL 273

28 Records